Construction 2005-2006

April 28, 2006      

Only the elevator is
missing (almost!)

Music Library entrance


June 2006
May 2006
April 2006
March 2006
February 2006
January 2006
December 2005
November 2005
October 2005
September 2005
August 2005


Construction of the green
room and storage space

Inside the kitchen

Hallway to the cold room

First residential floor

Shared bathroom

Second residential floor


The Beard Brigade
April 20, 2006    

Building the veranda

Inside the Music Library


Main entrance

Concert Hall





Second residential floor
emergency exit

Second residential floor
solarium

First residential floor

Inside the main entrance


April 13, 2006    

First windows installed
in the Concert Hall

Resiliant floor installation

First residential floor
Mudding

Second residential floor
room

Wild Party in the
mechanical room!


View from the Lake House




Veranda supporting posts
(North side)

April 7, 2006      

Cold room


Drainwater Heat Recovery

First residential floor



Room with private
bathroom

Lake view


Second residential floor

Shared bathroom, North side
(view on Couperin)

Foreground: Franz Liszt
Studio, background:
Zoltan Kodaly Studio

Giuseppe Verdi Studio

Heat pumps installation
(geothermal energy)