Construction 2005-2006

This series of photos concludes a 10 month journey during which 480 snapshots were presented to you, out of more than 3000 taken.  Thanks to Benoît Clément for his amateur photographer talents and to Peter Lowensteyn, indefatigable partner responsible for publication on the CAMMAC website.  Thanks also to Claudia Morawetz, webmaster.

June 24, 2006        




June 2006
May 2006
April 2006
March 2006
February 2006
January 2006
December 2005
November 2005
October 2005
September 2005
August 2005






Lake level lobby - Beside
the Music Library

Bartok Studio

Dining room





Concert Hall green roof
through second residential
floor blinds
June 16, 2006




Main Lobby




Concert Hall


Suspended lights in the
main stairway (to heaven)

Dining room

Music Library


Artistic Director's office



Emergency generator


Second residential floor

June 9, 2006


Ministry of Culture and
Communications
Integration of Arts


Main Lobby


Dining room floor being
finished

Concert Hall floor waiting
to be finished

Adapted private bathroom






Music Library

Concert Hall wall facing
the Lake House

Reed drying bed for
wastewater treatment
June 1, 2006



Main lobby

Dining room

Glassed and screened
veranda for three season use

Lake level

First residential floor room

Second residential floor
room


Concert Hall floor installation